CTC-ARI LCA Duty Free Shops – Phase 3a
The latest Larnaca Airport’s Duty Free Shops Renovation phase 3a included the Spirits Area.
In this very fast-paced project, our part has been to produce very detailed shop drawings, manufacture and install a large number of fusion units such as wall units and gondolas. Our team coordinated very closely with all of our collaborators in order to produce furniture pieces that combined solid wood, engineered wood, metal, acrylic, solid surface, glass, lighting and more all at once. All of this was feasible by using the latest technology and very detailed work.
COMMERCIAL
Location:
Larnaca International Airport – Glafkos Clerides
Year of Completion:
2020
Project Value:
MEDIUM
Duration:
16 weeks
Scope of Works:
Fusion (wood, acrylic, solid surface, metal, glass, lighting) furniture: gondolas, wall units, solid surface bar, perforated metal ceiling and wall cladding.
Client:
CTC-ARI Airports Ltd
Main Contractor:
Iacovou Brothers (Constructions) Ltd
Architect/Designer:
ODG Design